Ronquières: BORFLEX® and ERIKS handle 12 tonnes on a challenging construction site
The collaborative project between BORFLEX and ERIKS is characterised by the management of a complex industrial site requiring multi-faceted technical expertise. Faced with extremely tight deadlines and major logistical challenges, notably the transport of 12 tonnes of equipment over difficult terrain, BORFLEX was selected for its ability to integrate the entire value chain: from extrusion and moulding to final on-site installation. BORFLEX’s commitment was demonstrated through the development of bespoke solutions, such as a press adapted to the site and specialised transport trolleys, ensuring an exemplary finish and operational continuity thanks to dedicated teams.
Secteurs : Industry
River infrastructure
Application :
Supply and installation of rubber components on site